Home  |  Projects  |  Current Projects  |  Recently Bagged Projects
 
SL NO.

Description of the Work

Name and Address
of the Employer
1

Construction of 588.0m long PC Girder Bridge over Modhumati river on Gopalgonj-Singati Upazila (Chapail Ferrighat) Road at Ch. 2400m under Sadar Upazila of Gopalgonj District.

The Executive Engineer,
LGED, Gopalgonj
2

Construction/Extension of Major/Minor Bridges including earthwork on the approaches between Keshavganj (incl.)- Swarupganj (Excl.) section with Railway's design & drawing and construction of ORH at Abu Road in connection with Keshavganj-Swarupganj Patch Doubling Project.

Chief Engineer (Const.) III
North Western Railway,
5th Floor, New HQ Building,
Near Jawahar Circle,
Jaipur - 302 017
3

Rehabilitation and Resurfacing of road from West Phaileng to Marpara Road (0.00-27.00 Kmp), Package I

The Superintending Engineer,
P.W.D., Western Circle, Aizawl
4

Construction of High level Bridge (20 span 37.758) metre each (755.160 metre) crossing river at Dhanoya Pattan including Toll Plaza in Km 5.65 in District Gurdaspur

Chief Engineer (IP)
Pb. PWD B&R Branch, Chandigarh
5

Construction of High Level Bridge over Satluj River including Appraoches, Guide Bunds and Toll Plaza crossing Ludhiana Rahon road near village Mattewara in District Ludhiana

Chief Engineer (IP)
Pb. PWD B&R Branch, Chandigarh
6

Construction of 686.75m PC Girder Bridge on Arialkha River Kalkini Upazila Sadar-Kasherhat GC road at ch 12000m under Kalkini Upazila

Executive Engineer
LGED, Madaripur, Bangladesh
7

Civil, Structural & Architectural works for certain BOP and Misc Buildings civil works at 2X750MW Pragati III Combined cycle power project at Bawana, Delhi.
 
Esic
Annexure
Form IV
Form XVI
Form XVII
Labor License
     
Licence
Loi
Memorandum and Articles of Association
     
Notice Of Commencement
PF
Time Extension
     
     

SDGM/SCT
Bharat Heavy Electricals Limited
Power Sector - Northern Region,
Distt. Gautam Budh Nagar Noida - 201301
8

Water Supply and Sewerage, Second Small Towns Water Supply and Sanitation Sector Project - Indrapur, Morang

Project Director
Project Management Office,
Second Small Towns Water Supply and Sanitation Sector Project, Panipokhari,
Kathmandu, Nepal
9

Water Supply and Sewerage, Second Small Towns Water Supply and Sanitation Sector Project - Sandhikharka, Arghakanchi

Project Director
Project Management Office,
Second Small Towns Water Supply and Sanitation Sector Project, Panipokhari,
Kathmandu, Nepal
10

Water Supply and Sewerage, Second Small Towns Water Supply and Sanitation Sector Project - Damak, Jhapa

Project Director
Project Management Office,
Second Small Towns Water Supply and Sanitation Sector Project, Panipokhari,
Kathmandu, Nepal
11

Water Supply and Sewerage, Second Small Towns Water Supply and Sanitation Sector Project - Baglung, Baglung

Project Director
Project Management Office,
Second Small Towns Water Supply and Sanitation Sector Project, Panipokhari,
Kathmandu, Nepal
12

Remodeling and Covering of Subhash Nagar Drain Starting from Najafgarh Road to Najafgarh Drain.

Executive Engineer
Project-II, West Zone, MCD,
Moti Nagar, New Delhi -15
13

Construction of foundation substructure,superstructure, approaches, including allied and miscellancous works for major bridge no 145 at Ch 567775 (1 x 12.20 + 1x30.50 + 1x12.20 m (steel girder) major bridge no 152 at Ch 558950, 1x6.40 + 1x6.67 + 1x6.40m (RCC Box), major bridge No 154 at Ch 555520, 1x12.20 + 1x30.50 + 1x12.20m (steel girder) Major Bridge No 163 at Ch 544070, 1x30.50m (Steel Girder) and major bridge no 170 at Ch 538530, 1x6.4 + 1x6.67 + 1x6.67 + 1x6.40m (RCC Box) between Jamga-Belpahar Stations in connection with 3rd line between Champa-Jharsuguda. (Excluding Super structure)

Chief Engineer (Con.)/I
South East Central Railway
Office of the Chief Admn. Officer (Con)/
Bilaspur
14

Execution of Earth Work in formation including blanketing, Construction of minor bridges (RCC Boxes and Hume pipes etc.), Level crossing, Drains and other connected works in between Ch:- 3300 m to Ch:- 7500m (excluding approaches of major Bridges i.e. from 3445m to 4148m and Ch. 6813m to 7261m in connection with Khana-Bowaichandi new line in the jurisdiction of Dy. Chief Engineer (Con), BWN, S.E. Railway (Sec-I)

Chief Engineer (Con)/HQ
South Eastern Railway
Garden Reach,
Kolkata - 700 043