SL |
Category |
Place |
Description
of
the
Work |
Name
and
Address
of
the
Employer |
|
1 |
Urban |
Delhi |
Construction of Viaduct ( chainage 8176.540 m to 8716.210m and 9051.290 m to 9144.950 m ) for Airport Mctro Express Line. |
- |
|
2 |
Bridge |
Silchar |
Rebuilding of major bridge No.572 (proposed clear span 2x76.2m+1x61.0m + 1x23.60m + 6x24.4m) across river Barak in between Badarpur - Sukritipur stations of Lumding - Badarpur section on permanent diversion on well foundation including all other ancillary works in connection with Gauge Conversion of Lumding - Silchar MG Section (Risk & Cost) (Balance work against CA No. CON/S-L/620 dated 31.05.2002) |
- |
|
3 |
Bridge |
Kolkata |
Construction of Flyover on salt Lake Bypass Near intersecting point of J.K. Saha / WIPRO |
- |
|
4 |
Bridge |
West
Bengal |
Replacement of Girder for Bridge No. 2A at Kalinarayanpur and 17A at Dhubulia in Sealdah - Lalgola Section. |
- |
|
5 |
Bridge |
Bihar |
Construction of Foundation & Substructure of Rail Bridge across River Kosi at Nirmali In Bihar |
- |
|
6 |
Infra |
Cooch
Bihar |
Construction Of New Terminal Building and allied works at Cooch Behar airport |
- |
|
7 |
Infra |
Mizoram |
Strengthening of Lengpui Airport Runway Pavement |
- |
|
8 |
Infra |
Silchar |
Construction of reinforced cement concrete boxes behind abutments, ground improvement including earthwork in filling for maing Railway formation at approaches, of Br. No. 572 across river Barak in between Badarpur - Sukritipur Station on permanent diversion with all other ancillary works in connection with Gauge Conversion work of Lumding - Silchar Section |
- |
|
9 |
Infra |
Kolkata |
Improvement of Tram Tracks from Rashbehari Avenue Junction to Tollygunge Tram Depot |
- |
|
10 |
Infra |
Kolkata |
Construction of Sewerage & Drainage for Borough XIV including House Connection Lot - 2(Contract Package No. KEIP/ICB/SDB2/ 2004-05) |
- |
|
11 |
Road |
Kolkata |
Resection and Rehabilitation of city roads of KMC nearly 10 KM other than Mastic Pavement by Milling Mashine and repaving after cold and repaving after cold recycling with bituminous Binder such as foam bitumen. The Roads are 1) Udya Sankar Sarani 2) Prince Anwar Shah road 3) Convent Road 4) Northern Avenue |
- |
|
12 |
Road |
Mizorom |
Improvement & Upgradation of Mizoram State Roads Project Phase -II Contract Package No. MSRP/PIB |
- |
|
13 |
Infra |
Delhi |
Construction of approaches, Rail under Bridge service road, sump well cum pumphouse, welding / strengthening of road etc. as per drawing at Prem Nagar railway X-ing |
- |
|
14 |
Aviation |
Assam |
Construction
of
Terminal
Building
and
allied
works
at
Dibrugarh
Airport |
Executive
Director
Airport
Authority
of
India
New
Delhi |
|
15 |
Marine |
Assam |
Construction
of
Inland
Water
Transport
Terminal
at
PANDU,
GUWAHATI
(Low
Level
Berthing
and
Approach
Jetty) |
Executive
Engineer
Project
Division
No.
II
CPWD,
R.G
Baruah
Road
Guwahati
-
781005 |
|
16 |
Railways |
W.B. |
Construction
of
Elevated
Structure
for
Double
Line
Track
consisting
of
super-structure
with
pre-stressed
Concrete
Box
Girders
(casting
&
launching)
over
the
already
completed
sub-structures
(trestles)
between
Ch.3189.820m
to
Ch.5614.696m
in
connection
with
extension
of
Metro
Railway
from
Tollygunge
to
Garia |
The
Chief
Engineer
(O&M)
Metro
Railway
Metro
Rail
Bhawan
33/1,
J.L.
Nehru
Road
Kolkata
-
700
071 |
|
17 |
Railways |
W.B. |
Construction
of
Elevated
Structure
for
Double
Line
Track
consisting
of
super-structure
with
pre-stressed
Concrete
Box
Girders
(casting
&
launching)
over
the
already
completed
sub-structures
(trestles)
between
Ch.1688.838m
to
Ch.3189.820m
in
connection
with
extension
of
Metro
Railway
from
Tollygunge
to
Garia |
The
Chief
Engineer
(O&M)
Metro
Railway
Metro
Rail
Bhawan
33/1,
J.L.
Nehru
Road
Kolkata
-
700
071 |
|
18 |
Pipelines |
W.B. |
Construction
of
Sewerage
&
Drainage |
Kolkata
Environmental
Improvement
Project
(KEIP)
206
AJC
Bose
Road,
Kolkata
- 17 |
|
19 |
Pipelines |
W.B. |
Construction
of
Sewerage
&
Drainage |
Kolkata
Environmental
Improvement
Project
(KEIP)
206
AJC
Bose
Road |
|
20 |
Bridge |
Hyd |
Guntakal
Division
-
Raichur
-
Wadi
section
-
Rebuilding
of
bridge
no.
1123(1249)
across
river
Krishna
(Existing
36x30.48m
GB)
at
km
587/3-588/7
on
permanent
diversion-
proposed
construction
of
superstructure
with
PSC
box
girders,
as
36x30.15m
(clear
span)
for
two
lines
including
bed
blocks,
earthwork
in
formation
etc.,
between
Yadalapur
and
Krishna
stations
(Work
under
Risk
and
Cost) |
Chief
Admn.
Officer
/
Constn.
South
Central
Railway
Secunderabad
-
500
071 |